Author:
Author Unit:
In order to rationally leave the safety coal and rock pllars under the water body for the fully mechanized top coal caving mining in the ultra thick seam, b
ased on the calculation formula of the " two zone" heights suitable for the fully mechanized top coal caving mining face under the middle hard and soft weak overburden
strata regressively obtained with the site measure information, the left method of the " effective water insulated thickness method" and the " min safety thickness metho
d" were provided to the safety coal and rock pillar protective layer for the fully mechanized top coal caving mining under water body.The left value of the sand preventio
n safety coal and rock pillar and water prevention safety coal and rock pillar protective layer under the middle watery water body and rich watery water body was individ
ually provided.Based on the basis, the left method of the coal and rock pillars under the middle hard and soft weak overburden strata water body was completed for the
fully mechanized top coal caving mining.
Key Words:
fully mechanized top coal caving mining;safety coal and rock pllar;etting method;watery;
- Abstract
- Paper Chart
- Related Articles
- Citation Format
No Content Yet
No Content Yet