MA Li,LI Ruihang,LIU Fuming,et al. Study on  division of mining area under  influence of production capacity increasing of open-pit coal mine[J]. Coal Science and Technology,2023,51(11):63−70

. DOI: 10.13199/j.cnki.cst.2022-1125
Citation:

MA Li,LI Ruihang,LIU Fuming,et al. Study on  division of mining area under  influence of production capacity increasing of open-pit coal mine[J]. Coal Science and Technology,2023,51(11):63−70

. DOI: 10.13199/j.cnki.cst.2022-1125

Study on  division of mining area under  influence of production capacity increasing of open-pit coal mine

Funds: 

Natural Science Basic Research Program of Shaanxi Province (2019JQ-803); Shaanxi Province Innovation Capability Support Program (Science and Technology Innovation Team) Funding Project (2018TD-038)

More Information
  • Received Date: February 06, 2023
  • Available Online: November 05, 2023
  • It is of direct and great significance for increasing the economic benefits of mining by improving the production capacity of open-pit coal mines. Based on the mining status of an open-pit coal mine in Zhundong of Xinjiang, in view of the development goal of expanding its production capacity from 20 Mt/a to 50 Mt/a, the development requirements of the mining areas in line with the 50 Mt/a production capacity well be studied, as well as the optimal mining areas division and development relationship will be determined affected by capacity increase. The technically feasible and economically reasonable working face length of the open-pit coal mine is calculated as 2300~2500 m for the capacity expansion, and according to the optimal working face length and the contour map of the stripping ratio of the whole mining areas, four reasonable mining areas division schemes are proposed. By analyzing and determining the disadvantage and advantage of various mining area division schemes, mine indicators are adopted as impact indicators for evaluating mining areas division, such as the average working face length, the secondary stripping amount, the variation trend of the stripping ratio of each mining area, the stripping ratio of the first mining area, the early external-dumping transportation distance, and the difficult degree of internal-dumping, the numbers of mining areas connection, the exploration degree of the first mining area, and the difficult degree of mining areas connection. While the set-valued iterative method is combined for calculating index weight, a comprehensive evaluation model of the mining area division scheme is developed by adopting the method of TOPSIS. The research results show that the mining area is gradually advanced to the southwest for about 4000 m with the current mining position as the first, and then advances to the east through a 90° fan-shaped turning to the east boundary, which is the second mining area, and then the remaining unexploited mining fields are divided into third and fourth mining areas arranged in parallel Area. The stripping ratios from the first mining area to the fourth mining area are 1.85 m3/t, 3.04 m3/t, 3.68 m3/t, and 5.06 m3/t, respectively. The stripping ratio gradually increases with the continuous advance of the mining area, and the stripping ratio is evenly distributed in the four mining areas. In addition, the mining area division scheme can achieve small secondary stripping volume and early discharge distance, less connection times, high exploration degree in the first mining area and uniform working line length in each mining area under the condition of meeting the production capacity of 50 Mt/a, and has the minimum impact on the overall development of the mine and the economy.

  • [1]
    程 鹏. 准格尔黑岱沟与哈尔乌素露天矿协调开采下条区划分方案研究[J]. 煤炭技术,2019,38(11):26−29.

    CHENG Peng. Research on division of band-area under coordination mining technology of Heidaigou and Haerwusu open-pit mine in Zhungeer Mining Area[J]. Coal Technology,2019,38(11):26−29.
    [2]
    周 伟,才庆祥,谢廷堃,等. 大型近水平露天煤矿转向期间开拓运输系统优化研究[J]. 采矿与安全工程学报,2008,25(4):404−408.

    ZHOU Wei,CAI Qingxiang,XIE Tingkun,et al. Optimization of in-pit development transport system during transitional period in large open pit mine with flat coal deposit[J]. Journal of Mining & Safety Engineering,2008,25(4):404−408.
    [3]
    丁新启. 安太堡露天煤矿的分区开采及转向接续[J]. 露天采矿技术,2003(2):5−7.
    [4]
    徐志远,刘 勇,刘宪权. 安太堡矿转向期间反向内排方案的实施[J]. 露天采矿技术,2003(2):14−35.
    [5]
    张幼蒂, 李克民. 露天开采优化设计理论与应用[M]. 徐州: 中国矿业大学出版社, 2000.
    [6]
    刘宪权,段起超. 安太堡露天矿开采程序优化[J]. 煤炭工程,2006(11):5−6.
    [7]
    张利忠. 宝日希勒露天煤矿二采区3号煤层开采方案优化研究[D]. 阜新: 辽宁工程技术大学, 2014.

    ZHANG Lizhong. Research on streamline mining schemes of 3# coal seam in second mining district of Baorixile surface coal mine[D]. Fuxin: Liaoning Technical University, 2014.
    [8]
    白润才,白文政,刘光伟,等. 露天矿采区划分TOPSIS决策方法及应用[J]. 辽宁工程技术大学学报,2017,36(12):1240−1245.

    BAI Runcai,BAI Wenzheng,LIU Guangwei,et al. The division of the open-pit mining area-based TOPSIS decision making method and its application[J]. Journal of Liaoning Technical University,2017,36(12):1240−1245.
    [9]
    张瑞新,王忠强,于汝绶,等. 中国煤矿露天开采程序的优化研究[J]. 中国矿业,1998,7(1):48−52.

    ZHANG Ruixin,WANG Zhongqiang,YU Rushou,et al. Optimization of mining sequence for open pit[J]. China University of Mining and Technology,1998,7(1):48−52.
    [10]
    张瑞新,高永胜,李海华,等. 应用递阶优化的方法优化露天矿开采程序[J]. 煤炭学报,2003,28(5):491−495.

    ZHANG Ruixin,GAO Yongsheng,LI Haihua,et al. Optimization method of open-pit mining sequence and its applications[J]. Journal of China Coal Society,2003,28(5):491−495.
    [11]
    叶义成. 露天矿开采程序选优分析方法初探[J]. 武汉钢铁学院学报,1995,18(2):128−132.

    YE Yicheng. Study on the analysis method to optimize mining procedure of surface mining[J]. Journal of Wuhan Iron and Steel University,1995,18(2):128−132.
    [12]
    刘 桐. 霍林河一号露天矿采区划分及过渡优化研究[D]. 徐州: 中国矿业大学, 2016.

    LIU Tong. Optimization research on mining section dividing and transition for Huolin River No. 1 open-pit mine[D]. Xuzhou: China University of Mining and Technology, 2016.
    [13]
    赵红泽,郭锦桦,刘元旭,等. 再论露天矿群开采−采排复一体化协同采矿技术[J]. 煤炭科学技术,2022,50(2):47−55.

    ZHAO Hongze,GUO Jinhua,LIU Yuanxu,et al. Discussion on coordination of open-pit mine group mining and integration of mining-dumping-reclaiming[J]. Coal Science and Technology,2022,50(2):47−55.
    [14]
    李海斌. 倾斜煤层露天矿剥离工艺的选择[J]. 露天采矿技术,2019,34(5):91−93, 97.

    LI Haibin. Selection of stripping mining technology in inclined seam open-pit mine[J]. Opencast Mining Technology,2019,34(5):91−93, 97.
    [15]
    孙俊东. 胜利一号露天矿采区转向方式优化研究[J]. 煤炭工程,2021,53(9):11−15.

    SUN Jundong. Optimization of mining area steering scheme in Shengli No. 1 open-pit coal mine[J]. Coal Engineering,2021,53(9):11−15.
    [16]
    张子光,韩 勇,白继元. 红沙泉露天煤矿首采区转向研究[J]. 露天采矿技术,2021,36(5):16−19, 23.

    ZHANG Ziguang,HAN Yong,BAI Jiyuan. Research on first mining area turning in Hongshaquan open-pit coal mine[J]. Opencast Mining Technology,2021,36(5):16−19, 23.
    [17]
    韩 流,秦梓赫,舒继森,等. 基于多目标优化的露天矿进度计划编制方法研究[J]. 煤炭科学技术,2022,50(7):146−155.

    HAN Liu,QIN Zihe,SHU Jisen,et al. Research on open-pit mine schedule planning method based on multi-objective optimization[J]. Coal Science and Technology,2022,50(7):146−155.
    [18]
    陈世乾. 大唐胜利东二号露天矿北帮工作线长度的确定[J]. 露天采矿技术,2014(12):56−59.

    CHEN Shiqian. Determination of north slope working line length in Datang Shengli east No. 2 open-pit mine[J]. Opencast Mining Technology,2014(12):56−59.
    [19]
    CHEN Lili,ZOU Jie,ZHAO Yanfeng,et al. Iterative approximation of common attractive points of (α, β) -generalized hybrid set-valued mappings[J]. Journal of Fixed Point Theory and Applications,2019,21(2):1−17.
    [20]
    XIONG Tingjian, LAN Hengyou, et al. Iterative Algorithms for new general systems of Set-Valued variational inclusions involving (A, η)-maximal relaxed monotone operators [J]. Journal of Applied Mathematics, 2014.
    [21]
    马 力. 近水平露天煤矿抛掷爆破条件下多煤层开采关键技术研究[D]. 徐州: 中国矿业大学, 2015.

    MA Li. Key techniques of multi-coal seams mining under condition of adopting blast casting[D]. Xuzhou: China University of Mining and Technology, 2015.
    [22]
    SHADEMAN KHAKESTAR Marzieh,HASSANI Hossein,MOAREFVAND Parvizz,et al. Application of multi -criteria decision making methods in slope stability analysis of open pit mines[J]. Journal of The Geological Society of India,2016,87(2):213−221. doi: 10.1007/s12594-016-0389-6
    [23]
    ALPAY Serafettin,IPHAR Melih. Equipment selection based on two different fuzzy multi criteria decision making methods: Fuzzy TOPSIS and fuzzy VIKOR[J]. Open Geosciences,2018,10(1):661−677. doi: 10.1515/geo-2018-0053
    [24]
    ADIBI Nabiollah,ATAEE-POUR Majid,RAHMANPOUR Mehdi. Integration of sustainable development concepts in open pit mine design[J]. Journal of Cleaner Production,2015,108(7):1037−1049.
    [25]
    DAO Manh Tien,NGUYEN An Thinh,NGUYEN The Kien,et al. A hybrid approach using Fuzzy AHP-TOPSIS assessing environmental conflicts in the titan mining industry along central coast Vietnam[J]. Applied Sciences,2019,9(14):2930. doi: 10.3390/app9142930
  • Related Articles

    [1]LI Shuaiqian, GUO Zhongping, WEN Zhuoyue, XIE Zhonghui, HOU Zhengtao, LI Peng. Analysis of coal mine environment corrosion tendency based on fuzzy comprehensive evaluation method[J]. COAL SCIENCE AND TECHNOLOGY, 2025, 53(5): 52-63. DOI: 10.12438/cst.2024-0150
    [2]CHEN Juntao, LI Wenxin, XUE Feng, WANG Kai, ZHANG Chengxiang, SONG Tao. Comprehensive evaluation of TOPSIS-RSR grouting effect based on subjective and objective combined weights[J]. COAL SCIENCE AND TECHNOLOGY, 2023, 51(S2): 191-199. DOI: 10.13199/j.cnki.cst.2022-1695
    [3]LYU Yuguang, LI Hongjie, XIA Yujun, LIU Hanci, HAN Gang. Prediction and evaluation study on coal seam roof waterinrush based on multi-type four-double method[J]. COAL SCIENCE AND TECHNOLOGY, 2019, (9).
    [4]MEI Fang, KANG Yongshang, LI Zhe, DENG Ze, WANG Weihong, GU Jiaoyang. Applicability evaluation of logging method for recognition of coal body structure in medium and high rank coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2019, (7).
    [5]CHEN Xuefeng, MIAO Yongchun, CHEN Wentao. Study on evaluation of mine floor water inrush danger based on Fuzzy Set Pair Analysis Method[J]. COAL SCIENCE AND TECHNOLOGY, 2019, (2).
    [6]XIAO Lele, NIU Chao, DAI Gelian, NIE Wenjie, ZHANG Huiting, GAO Yafei. Evaluation of water abundance in Zhiluo formation based Watery Structure Index Method[J]. COAL SCIENCE AND TECHNOLOGY, 2018, (11).
    [7]ZHOU Mengran ZHANG Jiewei YAN Pengcheng HU Feng, . Study on water inrush monitoring technology of coal mine based on pH value temperature compensation method[J]. COAL SCIENCE AND TECHNOLOGY, 2017, (9).
    [8]Zhang Chunpeng wu Caifang Li TengZhang Xiaoyang, . Principal Component Analysis Method applied to evaluation on coalbed methane block selection[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (8).
    [9]Liao Wende Zhong Yonglin Ye Junjie Zhou Zhiqiang, . Quantitative evaluation method of mine gas disaster hazard sources based on AHP-FCE Method[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (6).
    [10]Application of Modified Water Inrush Coefficient Method to Evaluation of Water Inrush from Mine Floor[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (8).
  • Cited by

    Periodical cited type(3)

    1. 刘光伟,涂俊雄,郭伟强,韩雨轩,李春林,白羽,于明宇,贾瑞军. 复杂工程地质条件下露天矿采区转向过渡接续方案. 煤炭科学技术. 2025(03): 450-460 . 本站查看
    2. 马力,王恒荣,罗科,李瑞行,靳新宇,常治国. 分区内排露天煤矿压帮留沟模式及参数优化. 煤炭学报. 2024(04): 1834-1844 .
    3. 李雁飞. 西湾露天煤矿采区转向方案研究. 中国煤炭. 2024(08): 135-141 .

    Other cited types(1)

Catalog

    Article views (92) PDF downloads (31) Cited by(4)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return