Advance Search
LI Yinda, HAN Liu, SHANG Tao, CHEN Shuzhao. Study on height of pit-middle bridge in open-pit mine with flat seam deposit[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(8): 45-52.
Citation: LI Yinda, HAN Liu, SHANG Tao, CHEN Shuzhao. Study on height of pit-middle bridge in open-pit mine with flat seam deposit[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(8): 45-52.

Study on height of pit-middle bridge in open-pit mine with flat seam deposit

More Information
  • Available Online: April 02, 2023
  • Published Date: August 24, 2021
  • With the wide application of large mining trucks in open-pit mines in China,the establishment of an pit-middle bridge transportation system has gradually become an effective method of saving transportation costs. In order to give full play to the role of the pit-middle bridge transportation system in open-pit mines in saving transportation distance,the important parameter of the system-bridge deck height is optimized. This paper analyzes the change law of the truck transportation distance between the pit-middle bridge transportation system and the double-loop transportation system,takes the level of the pit as the benchmark,and considers the dynamic changes of the return distance from different levels to the bridge deck. According to the principle of minimum transportation power,the results of stripping materials at different working faces dynamic demarcation position,and on this basis,establish a calculation model of internal discharge transport work,and then obtain transportation costs. This model expands the service scope of the pit-middle bridge transportation system;in order to reduce the amount of secondary stripping of the bridge and realize the economical and reasonable removal of the bridge,the shape of the bridge at the overlapping position,the composition of the bridge and the secondary stripping process were analyzed,and an economically reasonable secondary was proposed. The concept and calculation method of stripping ratio,the ratio of the economically allowable maximum secondary stripping volume to the mining volume was obtained,so as to determine the maximum secondary stripping depth,and further establish the bridge demolition cost model;according to the principle of maximizing profit,the optimal height of the bridge body of the pit-middle bridge system is determined,so that the pit-middle bridge system of the near horizontal open pit mine can fully play its role and has certain universal value. Aiming at the current situation of Baorixile open-pit coal mining,it is found through model calculation that as the height of the bridge increases,the overall service range of the bridge increases,and the number of steps within the service range shows a law of changing from less to more to less;the transportation cost saved by a certain step decreases as the height difference between the step height and the bridge body increases;the maximum cost savings of different bridges increases with the increase of the height of the bridges. In the end,the best bridge height is 55 m,and the bridge can be increased by about 29.015 million yuan in one bypass cycle.
  • Related Articles

    [1]LIU Guangwei, HUANG Yunlong, CAO Bo, YAO Yong. Dynamic control of working slope shape and optimization of advance speed in seasonally stripped open-pit coal mine[J]. COAL SCIENCE AND TECHNOLOGY, 2023, 51(10): 45-54. DOI: 10.13199/j.cnki.cst.2023-0621
    [2]CAO Bo, WANG Shuai, HUANG Yunlong, LIU Guangwei, ZHANG Dongxu, SHI Guangyang, SUN Lei. Study on reasonable width of horizontal mining and internal drainage area in inclined coal seam open-pit mine[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(8): 38-44.
    [3]CAO Bo, TAO Yabin, HAN Yong, ZHANG Ziguang, BAI Wenzheng, LIU Zhilong. Division boundary optimization of inclined coal seam in open-pit mine under eroded burnt rock[J]. COAL SCIENCE AND TECHNOLOGY, 2020, 48(6).
    [4]DAI Jin-zhou ZHAI Ying-da MENG Tao, . Determination on Rational Width of Coal Pillar in Strip Mining Face[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (2).
    [5]Study on Strip Type Wongawilli Coal Mining Technology Under Buildings[J]. COAL SCIENCE AND TECHNOLOGY, 2013, (4).
    [6]Study on Mining and Caving Ratio of Fully Mechanized Top Coal Caving Mining Face Affected to Top Coal Recovery Rate[J]. COAL SCIENCE AND TECHNOLOGY, 2013, (3).
    [7]Analysis on Ground Subsidence Law of Strip Mining in Deep Mine[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (10).
    [8]Study on Seismic Waves Affected to Dynamic Stability of Coal Pillar in Strip Mining[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (7).
  • Cited by

    Periodical cited type(5)

    1. 于鹏,李永成,刘立虎,杨广鑫,刘光伟,李茂龙,任崇辉. 西二号露天煤矿向西一号井田露天开采过渡接续方案. 采矿技术. 2025(01): 34-41 .
    2. 刘光伟,涂俊雄,马显帅,姚勇,王亮,赵美玲. 相邻露天矿端帮断层带地质灾害隐患体治理方案. 煤炭科学技术. 2025(02): 314-328 . 本站查看
    3. 马力,王恒荣,罗科,李瑞行,靳新宇,常治国. 分区内排露天煤矿压帮留沟模式及参数优化. 煤炭学报. 2024(04): 1834-1844 .
    4. 蔡明祥,郭满,汪帅,徐全耀,高金龙,唐彬. 近水平复合煤层露天矿中间搭桥内排运输系统优化. 露天采矿技术. 2023(01): 7-11 .
    5. 阎仲康,曹银贵,李志涛,刘孝阳. 内蒙古东部草原区矿山生态修复研究:关键技术与减碳路径. 农业资源与环境学报. 2023(03): 570-582 .

    Other cited types(3)

Catalog

    Article views (98) PDF downloads (340) Cited by(8)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return