Advance Search
Support Technology of Large Cross Section Open-off Cut for Fully Mechanized Top Coal Caving Mining Face in Ultra Thick Seam[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (5).
Citation: Support Technology of Large Cross Section Open-off Cut for Fully Mechanized Top Coal Caving Mining Face in Ultra Thick Seam[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (5).

Support Technology of Large Cross Section Open-off Cut for Fully Mechanized Top Coal Caving Mining Face in Ultra Thick Seam

More Information
  • Available Online: April 02, 2023
  • Published Date: May 24, 2011
  • In order to solve the support dificulty of the open-off cut with a span of 10 m for the fully mechanized top coal caving mining face in Tashan Mine, the th eoretical analysis and the numerical calculation method was applied to set up the high strength bolt, the built-up anchor, the W steel band, the steel mesh and the concr ete combined support as the large span open-off cut support mode in order to form a group bolt closed effect and to keep the surrounding rock stability of the open-off C ut and the safety.During the test, the anchorage force of the anchor reached at 1401 60 kN, the max separation value of the roof in the anchorage zone was 7 mm and th e max convergence value between the roof and floor was 38 mm.The test results showed that the bolt-built-up anchor-concrete combined support proposed in the desig n could improve the integrated bearing force of the support structure, could effectively control the surrounding rock deformation of the open-off cut and could ensure the safety application of the large cross section open-off cut.
  • Related Articles

    [1]GAO Shigang, CHEN Sushe, CHAI Jing, YANG Yuyu, DU Wengang. Study on optimization of supporting technology for large cross-section open-off cut under contiguous gob[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(12): 20-28.
    [2]YANG Yuliang, XU Zhuhe, HAN Hao. Support technology of open-off cut in fully-mechanized mining face of large mining height with shallow buried depth and thin bedrock[J]. COAL SCIENCE AND TECHNOLOGY, 2020, 48(12).
    [3]WANG Hongzhi, ZHANG Dongsheng, WANG Xufeng, ZHANG Shenglong, CHENG Jixin. Study on bolt-mesh-anchor support technology of open-off cut with compound roof and large cross section[J]. COAL SCIENCE AND TECHNOLOGY, 2018, (4).
    [4]Kuang Tiejun. Study on overburden strata movement law at face end of high cutting fully-mechanized top coal caving face in ultra thick seam[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (6).
    [5]Yan Shaohong Xu Gang Zhang Xueliang Zhang Zhen, . Reason analyses on large area roof cutting and collapse of hydraulic supports at fully-mechanized top coal caving mining face in ultra thick coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (6).
    [6]CHEN Bing. Cause Analysis and Prevention Technology of Roof Cutting Powered Support Jammed Occurred in Fully- Mechanized Top Coal Caving Mining Face[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (9).
    [7]Study on Support Parameters Optimization of Large Cross Section Open-Off Cut with Broken Roof in Deep Underground Mine[J]. COAL SCIENCE AND TECHNOLOGY, 2013, (4).
    [8]Rapid Construction and Support Technology of Large Span Open-off Cut for Fully Mechanized Caving Mining Face in Thick Seam of Deep Mine[J]. COAL SCIENCE AND TECHNOLOGY, 2012, (6).
    [9]Roof Support Technology of Open-Off Cut for Fully Mechanized Coal Mining Face Under Goaf Area[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (6).
    [10]Design on Powerful Advance Support System of Mining Gateway in Fully Mechanized Top Coal Caving Mining Face in Deep Mine[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (6).
  • Cited by

    Periodical cited type(28)

    1. 毕青泉,王西伟,郭钏,焦振凯,尹万蕾. 锚固巷道冲击地压发生条件及影响因素研究. 科技创新与应用. 2025(04): 74-80 .
    2. 董宏伟. 采矿工程中超前支护技术的应用. 能源与节能. 2025(02): 219-221 .
    3. 张建卓,万传旭,肖永惠,陈策,王涛,郭昊. 吸能构件阻力特性对液压立柱抗冲击特性影响研究. 振动与冲击. 2025(04): 217-228 .
    4. 张帆,李玉雪,李昱翰,邵光耀. 基于数字孪生的煤矿两柱式支架载荷预测方法. 煤炭科学技术. 2025(01): 312-325 . 本站查看
    5. 王向阳,刘博. 煤矿综采工作面设备快速回撤技术研究. 能源与环保. 2025(02): 265-271 .
    6. 陈勇,武振,王恒志,商和福. 梯度冲击载荷下自移式单元支架动态响应特征研究. 煤炭工程. 2025(03): 126-133 .
    7. 田晓杰. 超大采高液压支架支护安全特性研究. 山东煤炭科技. 2024(05): 115-119 .
    8. 许海亮,郑鑫雷,刘玉欣. 内嵌管板式六边折纹吸能构件吸能特性研究. 北方工业大学学报. 2024(04): 32-40 .
    9. 骆元庆,何涛,王传礼,罗刚,秦颖. 巷道临时支护支架同步阀阀腔气蚀特性研究. 煤炭工程. 2023(01): 100-105 .
    10. 宋振江,王海博. 冲击危险性工作面巷道失稳原因及超前支护研究. 山东煤炭科技. 2023(01): 84-86 .
    11. 李明昌. 煤矿综采工作面液压支架自动快速跟机技术研究. 机械管理开发. 2023(04): 236-237+240 .
    12. 王绪俊,赵一鸣. 济三煤矿坚硬顶板下回采巷道支护系统抗冲击能力分析. 煤炭科技. 2023(03): 30-35 .
    13. 张坤,孙政贤,刘亚,李玉霞,杜明超,马英,魏训涛,徐亚军,王鑫,余铜柱,丁超. 基于信息融合技术的超前液压支架姿态感知方法及实验验证. 煤炭学报. 2023(S1): 345-356 .
    14. 王洁,赵显昆,姜彪,张建卓,郭昊. 基于AHP-模糊模型的液压支架试验台中梁销轴节点优化研究. 煤炭科学技术. 2023(08): 250-259 . 本站查看
    15. 刘淑红,侯建军,李美晨,杨治国. 典型山地压覆煤层冲击地压与瓦斯协同防治技术研究. 煤炭工程. 2023(09): 60-66 .
    16. 康龙龙. 东曲煤矿18304工作面瓦斯治理与粉尘防治. 现代矿业. 2023(09): 244-246+281 .
    17. 张向阳,蔡保华,焦伟,马江鹏,尚楠,余涛涛,马文涛. 深部综放工作面冲击危险性分析及防冲技术研究. 煤炭科技. 2023(05): 99-104+109 .
    18. 曹文明,刘蜜桦,张文炀. 履带自移式超前支架机器人的研究. 煤矿机械. 2022(05): 49-51 .
    19. 董川龙,宁掌玄. 冲击载荷作用下矿柱力学响应特征分析. 煤炭科学技术. 2022(03): 102-110 . 本站查看
    20. 王志睿. 51000B回风顺槽工作面支护设计研究. 机械管理开发. 2022(03): 11-13 .
    21. 徐连满,马柳,姜笑楠,路凯旋,肖永惠,朱丽媛. 冲击地压载荷下O型棚支架动力响应规律研究. 煤炭科学技术. 2022(04): 49-57 . 本站查看
    22. 潘立友,唐鹏,周脉来,李彩荣. 悬顶结构巷道冲击地压防控研究. 煤炭科学技术. 2022(04): 42-48 . 本站查看
    23. 彭海朝. 采煤工作面超前段围岩变形控制技术研究. 中国石油和化工标准与质量. 2022(11): 163-164+167 .
    24. 胡文达. 综采工作面支护方案优化设计研究. 山西冶金. 2022(04): 25-27+58 .
    25. 张科学,朱俊傲,何满潮,亢磊,姜耀东,李东,孙健东,程志恒,王晓玲,杨海江,吴永伟,闫星辰,李举然,尹宇航. 向斜作用下回采巷道冲击地压力学分析及冲击特性研究. 煤炭科学技术. 2022(07): 84-98 . 本站查看
    26. 张亮. 综采工作面支护优化研究. 矿业装备. 2022(05): 46-47 .
    27. 宋振铎,迟焕磊,刘思程,侯慧锦,刘佳金. 综采工作面回撤通道围岩支护稳定性分析. 能源与环保. 2022(12): 24-30 .
    28. 宋铃铃. 综采工作面超前液压支架设计与应用. 晋控科学技术. 2022(05): 41-43 .

    Other cited types(16)

Catalog

    Article views (478) PDF downloads (0) Cited by(44)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return