Advance Search
ZHOU Xinhe, WENG Mingyue, SU Shijie, LI Guangjiang. Study on stereoscopic prevention and control technology of roof water disaster in contiguous coal seam in deep mines of Inner Mongolia and Shaanxi[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(12): 165-172.
Citation: ZHOU Xinhe, WENG Mingyue, SU Shijie, LI Guangjiang. Study on stereoscopic prevention and control technology of roof water disaster in contiguous coal seam in deep mines of Inner Mongolia and Shaanxi[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(12): 165-172.

Study on stereoscopic prevention and control technology of roof water disaster in contiguous coal seam in deep mines of Inner Mongolia and Shaanxi

More Information
  • Available Online: April 02, 2023
  • Published Date: December 24, 2021
  • In view of the complex hydrogeological conditions of the deep Jurassic coal seam mining in Ineer Mongolia-Shaanxi area, the mine is faced with problems such as difficult drainage of roof, high pressure of drainage system, low excavation efficiency and poor economic benefits during the mining. The water hazard prevention and control idea of “low-position adjacent face interception, prevention and control by zones, management by layers and groups” was put forward. The three-dimensional prevention and control scheme of roof water hazard in close distance coal seam and the evaluation system of three-dimensional prevention and control effect based on water inflow of single hole, water pressure of borehole and static reserve were established. Taking the short-distance mining roof water hazard prevention in Menkeqing Mines 3-1 and 2-2 of the Hujierte Mining Area as an example,fine exploration was carried out by means of up-down drilling and geophysical prospecting, etc., and the up-down well hydrological monitoring system was established and improved. On the basis of analyzing and studying important hydrogeological parameters such as the geological distribution of the aquifer-containing layer on the roof of the mine, the distribution range of anomalous water-rich areas, and the characteristics of the interval and groundwater flow field, the upward mining method was implemented. First, the roof drainage of the 3-1 coal of 3101 working face was carried out in a targeted manner, and the water inflow of the working face was accurately predicted through the drainage test, and a complete and reliable drainage system was established. The cumulative drainage volume of water drainage boreholes reached 26.59 million m?. During the excavation of 2201 working face, it was discovered through advanced water-discharging drill holes that,the water pressure and water quantity of the roof aquifer decreased to varying degrees compared with that of coal 3-1, indicating that the water content of the roof aquifer of coal 2-2 was reduced by cutting off the flow of coal 3-1 in the lower layer in advance, and the water damage prevention scheme has achieved preliminary effects. Before mining at the 2201 working face, combined with the sedimentary geological analysis and the delineated range of geophysical anomaly areas, the drainage work of roof water in key areas and layers was carried out to further optimize the design of drilling holes for roof water drainage. According to the water quantity and water pressure of each final hole, the water richness of coal roof aquifer in 2-2 decreased significantly. All these indicate that the proposed method of controlling roof water damage on a large scale by region and coal group, formed a three-dimensional prevention and control technology for roof water damage in deep coal mines in Inner Mongolia and Shaanxi, which is beneficial to the prevention and control of roof water damage in close range coal seams.
  • Related Articles

    [1]Wang Cheng Hong Zijie Xiong Zuqiang Liu Xufeng Li Yingqiang, . Spalling prevention technology of delta area in high cutting coal mining face[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (2).
    [2]Wang Qichun Jia Pengju Guo Guangli Zha Jianfeng, . Design on backfill bodyOs compression ratio in waste backfilling coal mining under dam[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (7).
    [3]DAI Gui-sheng ZHOU Hai-feng, . Study on Key Technology of High Cutting Coal Mining Face with Annual Coal Production of 14 Million Tons[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (12).
    [4]SHAN Yong-quan. Study on Rapid Holing-Through Technology of High Cutting Height Coal Mining Face During Terminal Mining Stage[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (11).
    [5]TONG Qiang CHE Yu-long, . Design and Application of Gangue Vertical Feeding System for Mine Fill Mining[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (8).
    [6]Technology of Gateway Retained Along Goaf with Quick Setting Concrete Backilled at Gateway Sidewall in Underground Mine[J]. COAL SCIENCE AND TECHNOLOGY, 2013, (5).
    [7]Study on Surface Ground Movement Law of Coal Rejects Backfill Mining Under Thick and Loose Overburden Strata[J]. COAL SCIENCE AND TECHNOLOGY, 2013, (2).
    [8]Effect Analysis on Gas Control with Local High Level Gas Drainage Gateway at Initial Mining Period of Fully Mechanized Top Coal Caving Mining Face[J]. COAL SCIENCE AND TECHNOLOGY, 2012, (5).
    [9]Experiment on Longwall Mining with Coal Rejects Backfill in Thick Seam with Shallow Depth Under Buildings[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (8).
    [10]Rational Selection of Mining Method for High Cutting Coal Mining Face[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (5).

Catalog

    Article views (110) PDF downloads (270) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return