LIU Guangwei,HUANG Yunlong,CAO Bo,et al. Parameter control method of working slope passing fault in open-pit coal mine[J]. Coal Science and Technology,2023,51(4):56−65

. DOI: 10.13199/j.cnki.cst.2022-0837
Citation:

LIU Guangwei,HUANG Yunlong,CAO Bo,et al. Parameter control method of working slope passing fault in open-pit coal mine[J]. Coal Science and Technology,2023,51(4):56−65

. DOI: 10.13199/j.cnki.cst.2022-0837

Parameter control method of working slope passing fault in open-pit coal mine

Funds: 

National Natural Science Foundation of China (51974144); Science and Technology Research Project of Liaoning Province (2021JH1/10400011); Subject Innovation Team Project of Liaoning Technical University (LNTU20TD-07)

More Information
  • Received Date: May 02, 2022
  • Available Online: May 11, 2023
  • Large open-pit coal mines often encounter fault structures with different development scope and degree within the mining boundary. In order to optimize and determine the relevant parameters of the working slope passing through the fault in the open-pit coal mine, the change of the working slope passing through the fault mode and the length of the working line when the relative position between the working line and the fault strike is different is analyzed, the principle of coal resource recovery in the fault affected area is determined, and the influencing factors of the production stripping ratio change in the process of working slope advancing when the working line intersects the fault strike are expounded. According to the basic principle of open-pit mining, the engineering model of the strike arrangement of the intersecting faults of the working slope is established, the composition of the working line is discussed, and the calculation method of the working line length is given. The three-dimensional space rectangular coordinate system with the working line layout direction and the working side advancing direction as the axis is constructed, the section stripping volume and raw coal volume of each engineering model are calculated, and the functional relationship between the working line length, the angle between the working line and the fault strike, the working side advancing distance and the production stripping ratio is determined. The change rule of production stripping ratio is analyzed by means of control variables. The results show that the initial production stripping ratio is positively related to the length of the fault descending wall working line when the stripping working line is orthogonal to the fault strike; When the strike of the oblique fault of the working wall is advancing, the initial production stripping ratio is negatively related to the length of the working line of the fault riser and the angle between the working line and the fault strike. The smaller the angle between the working line and the fault strike, the more intense the change of the production stripping ratio. This paper presents the optimization principle of the parameters of the working slope passing through the fault in the open-pit coal mine, and puts forward the method of determining the parameters by using the computer program to judge circularly. Taking Shengli West No. 2 Coal Mine as the engineering background, the above optimization principles and determination methods are applied and studied. The results show that when the angle between the working line and the fault strike is 70 ° and the length of the initial footwall mining working line is 1700 m, the production stripping ratio of the working side is less than the economic and reasonable stripping ratio in the process of advancing in the F13 fault area, the length of the working line always meets the minimum working line length requirements for equipment operation, running and deployment, and the east side slope expansion is the minimum.

  • [1]
    刘光伟,李 鹏,白润才. 露天矿过断层开采方式及生产能力接续分析[J]. 重庆大学学报,2015,38(3):123−129. doi: 10.11835/j.issn.1005-2909.2015.03.030

    LIU Guangwei,LI Peng,BAI Runcai. Analysis on mining mode and production capacity of open-pit through fault[J]. Journal of Chongqing University,2015,38(3):123−129. doi: 10.11835/j.issn.1005-2909.2015.03.030
    [2]
    魏 旭. 过断层巷道围岩力学特性及其应力梯度破坏研究[D]. 北京: 中国矿业大学(北京), 2020: 97−146.

    WEI Xu. Study on mechanical properties of surrounding rock from a roadway through a fault and stress gradient failure[D]. Beijing : China University of Mining & Technology-Beijing, 2020: 97−146.
    [3]
    赵毅鑫,王 浩,卢志国,等. 开采扰动下断层面库仑应力及诱发矿震时空演化特征[J]. 煤炭学报,2018,43(2):340−347.

    ZHAO Yixin,WANG Hao,LU Zhiguo,et al. Characteristics of tremor time-space evolution and Coulomb stress distribution along the fault during workface excavation[J]. Journal of China Coal Society,2018,43(2):340−347.
    [4]
    王兆会,杨敬虎,孟 浩. 大采高工作面过断层构造煤壁片帮机理及控制[J]. 煤炭学报,2015,40(1):42−49.

    WANG Zhaohui,YANG Jinghu,MENG Hao. Mechanism and controlling technology of rib spalling in mining face with large cutting height passing through fault[J]. Journal of China Coal Society,2015,40(1):42−49.
    [5]
    高玉兵,王 炯,高海南,等. 断层构造影响下切顶卸压自动成巷矿压规律及围岩控制[J]. 岩石力学与工程学报,2019,38(11):2182−2193.

    GAO Yubing,WANG Jiong,GAO Hainan,et al. Mine pressure distribution and surrounding rock control of gob-side entry formed by roof cutting and pressure release under the influence of faults[J]. Chinese Journal of Rock Mechanics and Engineering,2019,38(11):2182−2193.
    [6]
    王 普. 工作面正断层采动效应及煤岩冲击失稳机理研究[D]. 青岛: 山东科技大学, 2018: 103-115.

    WANG Pu. Study on mining effect caused by normal fault and the inducing mechanism of rock burst[D]. Qingdao: Shandong University of Science and Technology, 2018: 103-115.
    [7]
    李 超. 断层对大采高综采工作面矿压及顶板运移规律影响研究[D]. 太原: 太原理工大学, 2016: 43−64.

    LI Chao. Study on influence of laws on rock pressure and roof movement made by the fault in large mining height fully mechanized face[D]. Taiyuan: Taiyuan University of Technology, 2016: 43−64.
    [8]
    葛 普. 大倾角综采工作面遇断层开采技术研究[D]. 西安: 西安科技大学, 2020: 9−18.

    GE Pu. Research on fault technology on the fully mechanized working[D]. Xi’an: Xi’an University of Science and Technology, 2020: −18.
    [9]
    孟庆彬,韩立军,齐 彪,等. 复杂地质条件下巷道过断层关键技术研究及应用[J]. 采矿与安全工程学报,2017,34(2):199−207.

    MENG Qingbin,HAN Lijun,QI Biao,et al. Study and application of key technology for roadway crossing faults under complex geological conditions[J]. Journal of Mining & Safety Engineering,2017,34(2):199−207.
    [10]
    马立强, 余伊河, 金志远, 等. 大倾角综放面预掘巷道群快速过断层技术[J]. 采矿与安全工程学报, 2015, 32(1): 84−89.

    MA Liqiang, YU Yihe, JIN Zhiyuan, et al. Fast pushing through fault of the pre-driven roadway groups in fully mechanized top-coal caving face with big dip angle[J] Journal of Mining & Safety Engineering, 2015, 32(1): 84−89.
    [11]
    薛大伟. 钱营孜煤矿石门过断层技术及管理研究[D]. 徐州: 中国矿业大学, 2019: 7−35.

    XUE Dawei. Research on technology and management of cross-hole passing through fault in QianYingzi Coal Mine[D]. Xuzhou: China University of Mining & Technology, 2019: 7−35.
    [12]
    蔡赫男. 红庆梁煤矿软岩巷道过断层支护技术研究[D]. 阜新: 辽宁工程技术大学, 2016: 35−49.

    CAI Henan. Study on the supporting technology of the fault in the soft rock roadway of Hong Qingliang coal mine[D]. Fuxin: Liaoning Technical University, 2016: 35−49.
    [13]
    赵毅鑫,姜耀东,孟 磊,等. 超前管棚注浆支护技术在极复杂断层带中的应用[J]. 采矿与安全工程学报,2013,30(2):262−266.

    ZHAO Yixin,JIANG Yaodong,MENG Lei,et al. Supporting technique with advanced pipe-shed grouting in extremely complicated faulting zone[J]. Journal of Mining & Safety Engineering,2013,30(2):262−266.
    [14]
    徐 仁. 晟聚矿复杂断层构造区域内回采巷道支护技术研究[D]. 包头: 内蒙古科技大学, 2019: 44-49.

    XU Ren. Research on support technology of mining roadway in complex fault structure area of Shenju coal mine[D]. Baotou: Inner Mongolia University of Science & Technology, 2019: 44-49.
    [15]
    殷增光. 软岩巷道穿越断层破碎带支护技术研究[D]. 阜新: 辽宁工程技术大学, 2017: 45−54.

    YIN Zengguang. Research on support technology for soft rock roadway crossing fault fracture zone[D]. Fuxin: Liaoning Technical University, 2017: 45−54.
    [16]
    王 东,宋伟豪,张 岩. 露天矿含断层逆倾边坡滑面确定方法及应用[J]. 辽宁工程技术大学学报(自然科学版),2019,38(3):212−215.

    WANG Dong,SONG Weihao,ZHANG Yan. Sliding surface determination method and application of reverse dip slope with fault in open-pit mines[J]. Journal of Liaoning Technical University (Natural Science),2019,38(3):212−215.
    [17]
    梅开品,武尚荣. 露天矿含断层岩质边坡变形破坏机理研究[J]. 有色金属设计,2020,47(3):8−11.

    MEI Kaipin,WU Shangrong. Research into the deformation and break Mechanism of the fault rock slope in open-pit[J]. Nonferrous Metals Design,2020,47(3):8−11.
    [18]
    曹兰柱,祁利民,王 东,等. 露天矿含断层复合边坡稳定性[J]. 辽宁工程技术大学学报(自然科学版),2016,35(8):804−809.

    CAO Lanzhu,QI Limin,WANG Dong,et al. Research of combination slope with fault in open-pit mine[J]. Journal of Liaoning Technical University(Natural Science),2016,35(8):804−809.
    [19]
    关依梦,范军富,刘光伟. 露天煤矿过正断层动态剥采比时空优化控制[J]. 辽宁工程技术大学学报(自然科学版),2016,35(6):571−575.

    GUAN Yimeng,FAN Junfu,LIU Guangwei. Optimization and control on dynamic stripping ratio during the fault in surface coal mine[J]. Journal of Liaoning Technical University(Natural Science),2016,35(6):571−575.
    [20]
    李志鹏,姜 威. 露天煤矿过断层生产能力过渡接续研究[J]. 煤炭与化工,2016,39(6):20−24,29.

    LI Zhipeng,JIANG Wei. Study on transition connection of open-pit mine production capacity crossing the fault[J]. Coal and Chemical Industry,2016,39(6):20−24,29.
    [21]
    何 保, 张亚明. 煤矿地质学[M]. 沈阳: 东北大学出版社, 2013.
    [22]
    杨荣新. 露天采矿学(下册)[M]. 徐州: 中国矿业大学出版社, 1990.
    [23]
    于汝绶,习永峰. 露天矿工作线长度的优化[J]. 中国矿业学院学报,1986(1):18−32.

    YU Rushou,XI Yongfeng. Optimization of working line length of open-pit mines[J]. Journal of Chinese University of Mining,1986(1):18−32.
    [24]
    王海清,李景柱. 胜利露天煤矿工作线长度优化[J]. 露天采矿技术,2007(3):11−12,16.

    WANG Haiqing,LI Jinzhu. Optimization of working line length of Shengli opencast mine[J]. Opencast Mining Technology,2007(3):11−12,16.
    [25]
    宋子岭,白润才,刘仲田. 武家塔露天煤矿合理工作线长度的确定[J]. 露天采矿技术,2005(3):4−6.

    SONG Ziling,BAI Runcai,LIU Zhongtian. Determination of reasonable front length in Wujiata open-pit coal mine[J]. Opencast Mining Technology,2005(3):4−6.
    [26]
    白润才,付恩三,刘光伟,曲业明. 吉林郭勒二号露天矿合理工作线长度的优化[J]. 世界科技研究与发展,2013,35(3):365−369.

    BAI Runcai,FU Ensan,LIU Guangwei,et al. Optimization of reasonable front length in Jilinguole NO. 2 surface coal mine[J]. World SCI-TECH R & D,2013,35(3):365−369.
    [27]
    中国煤炭建设协会勘察设计委员会,中煤科工集团沈阳设计研究院有限公司.煤炭工业露天矿设计规范: GB50197-2015 [S].北京: 中国计划出版社, 2015.

    Survey and design committee of China coal construction association, CCTEG Shenyang engineering company. Code for design of open pit mine of coal industry: GB50197-2015 [S].Beijing: China Planning Press, 2015.
  • Related Articles

    [1]LIAN Donghui, YUAN Ruifu, CUI Kefei, MA Xiang, YUAN Penghui, PAN Kun. Research and application of automatic production technology of fully mechanized longwall working face[J]. COAL SCIENCE AND TECHNOLOGY, 2025, 53(S1): 412-421. DOI: 10.12438/cst.2024-0115
    [2]LIU Guangwei, HUANG Yunlong, CAO Bo, YAO Yong. Dynamic control of working slope shape and optimization of advance speed in seasonally stripped open-pit coal mine[J]. COAL SCIENCE AND TECHNOLOGY, 2023, 51(10): 45-54. DOI: 10.13199/j.cnki.cst.2023-0621
    [3]REN Zheng, ZHANG Kexue, JIANG Yaodong. Research on response of stress field in working face during the thrust fault activation process under mining disturbance[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(9): 61-68.
    [4]MA Zhaorui. Study on co-existence mechanism of tensile-shear failure of rib spalling in large mining height working face[J]. COAL SCIENCE AND TECHNOLOGY, 2020, 48(12).
    [5]DUAN Weihua. Study on mechanism and control technology of rib spalling in large mining height working face[J]. COAL SCIENCE AND TECHNOLOGY, 2020, 48(3).
    [6]Ren Huaiwei. Development and application of robot intelligent welding production line to hydraulic powered support[J]. COAL SCIENCE AND TECHNOLOGY, 2017, (5).
    [7]MIAO Wei. Optimization of Throw Blasting-Shovel and Truck Technical Operation Line Distance in Surface Mine[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (4).
    [8]Study on Mining Induced Stress Distribution Law of Fault Occurred in Island Face[J]. COAL SCIENCE AND TECHNOLOGY, 2012, (7).
  • Cited by

    Periodical cited type(0)

    Other cited types(1)

Catalog

    Article views (213) PDF downloads (67) Cited by(1)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return