Citation: | LI Junpeng,WANG Wencai,WANG Chuangye,et al. Mechanism and control of slope instability slip induced by overburden migration in side coal mining[J]. Coal Science and Technology,2025,53(5):127−143. DOI: 10.12438/cst.2024-0169 |
Due to multiple factors, open pit mining will form a large amount of trapped coal on the side wall. With the end of internal discharge and reclamation, these trapped resources will be permanently lost, resulting in great waste. In order to reduce resource waste, shaft mining is widely used, but due to the typical deformation, failure and instability of slope, it brings great safety risks to the mining on the side wall and seriously restricts the recovery of resources. Therefore, it is an important topic for geotechnical engineering and mining engineering to clarify the sliding mechanism and control mechanism of mining slope under mining disturbance and guarantee the stability of slope. In view of this, this paper comprehensively uses physical and numerical simulation, mechanical analysis and other means to study the overburden migration law, the deformation and failure characteristics of mining slope, the instability sliding mechanism and its control mechanism. The following innovative results have been achieved: The evolution law and formation mechanism of the failure form in the “transverse three zones” of the mining slope are revealed, and the relationship between the failure and the coupling failure and instability slip of the mining slope is clarified, and the phenomenon of “circular arc” sliding surface, shear slip zone and local instability slip of the slope is easily caused by mining in the lower coal seam. The co-existent failure characteristics of step collapse and tensile and shear crack of mining slope are obtained. A mechanical model of “masonry beam” of mining slope was established, and the dynamic evolution of “masonry beam” and the relationship between the rotation mechanism of key rock B and the instability and sliding of mining slope were revealed. It is found that the main reasons for the sliding of mining slope are the repeated movement of the “masonry beam” structure, the continuous forward movement of the “transverse three zones” structure, the horizontal thrust formed by the key block B's instability, and the sliding mechanism of “mining cave-bedding creep−slope instability”. The control method of mining slope instability slip for controlling the rotation of key rock block B of “masonry beam” is proposed and analyzed. It is concluded that the backfill pressure foot control method can effectively change the fracture degree of hinged rock block and inhibit the rotation of key rock block B on the basis of curbing horizontal thrust transmission, and achieve the effective control of mining slope instability slip. Based on this, the engineering application and verification are carried out, and the stability control system of mining slope is formed, which provides guarantee for the safe and efficient recovery of side coal.
[1] |
王双明,申艳军,宋世杰,等. “双碳”目标下煤炭能源地位变化与绿色低碳开发[J]. 煤炭学报,2023,48(7):2599−2612.
WANG ShuangMing,SHEN YanJun,SONG ShiJie,et al. Change of coal energy status and green and low-carbon development under the “dual carbon”goal[J]. Journal of China Coal Society,2023,48(7):2599−2612.
|
[2] |
马力,刘晨东,罗强,等. 相邻露天煤矿边帮煤开采内排留沟高度优化[J]. 采矿与安全工程学报,2021,38(5):997−1004.
MA Li,LIU Chendong,LUO Qiang,et al. Optimization of inner dumping ditch height for end-wall coal mining in adjacent open-pit coalmines[J]. Journal of Mining & Safety Engineering,2021,38(5):997−1004.
|
[3] |
王文才,李俊鹏,王创业,等. 边帮煤采动影响下边坡变形演化特征及失稳形态分析[J]. 煤炭科学技术,2023,51(7):321−336.
WANG Wencai,LI Junpeng,WANG Chuangye,et al. Analysis of failure mode and deformation evolution charac teristics of slopes under the influence of highwall mining[J]. Coal Science and Technolog,2023,51(7):321−336.
|
[4] |
CHEN Y L,CAI Q X,SHANG T,et al. Mining system for remaining coal of final highwall[J]. Journal of Mining Science,2011,47(6):771−777. doi: 10.1134/S1062739147060098
|
[5] |
ROSS C,CONOVER D,BAINE J. Highwall mining of thick,steeply dipping coal–a case study in geotechnical design and recovery optimization[J]. International Journal of Mining Science and Technology,2019,29(5):777−780. doi: 10.1016/j.ijmst.2017.12.022
|
[6] |
BONILLA–SIERRA V,SCHOLTÈS L,DONZÉ F,et al. DEM analysis of rock bridges and the contribution to rock slope stability in the case of translational sliding failures[J]. International Journal of Rock Mechanics and Mining Sciences,2015,80:67−78. doi: 10.1016/j.ijrmms.2015.09.008
|
[7] |
XU N X,ZHANG J Y,TIAN H,et al. Discrete element modeling of strata and surface movement induced by mining under open-pit final slope[J]. International Journal of Rock Mechanics and Mining Sciences,2016,88:61−76. doi: 10.1016/j.ijrmms.2016.07.006
|
[8] |
殷志祥,董慧. 基于边坡稳定性的SHM开采端帮特厚煤层影响参数研究[J]. 应用基础与工程科学学报,2015,23(1):56−67.
YIN Zhixiang,DONG Hui. Impact parameters of SHM for thick coal seam mining of open-pit slope based on slope stability[J]. Journal of Basic Science and Engineering,2015,23(1):56−67.
|
[9] |
丁鑫品,李凤明,付天光,等. 端帮采场覆岩移动破坏规律及边坡稳定控制方法[J]. 煤炭学报,2021,46(9):1753−1763.
DING Xinpin,LI Fuming,FU Tianguang,et al. Overburden movement and failure law of coalface in end slope and the slope stability control method[J]. Journal of China Coal Society,2021,46(9):1753−1763.
|
[10] |
韩阳. 黑岱沟露天矿端帮煤井工开采地表移动规律研究[D]. 阜新:辽宁工程技术大学,2017.
HAN Yang. Study on surface movement law of slope coal in Heidaigou open pit coal mine[D]. Fuxin:Liaoning Technical University,2017.
|
[11] |
ALEJANO L R,FERRERO A M,RAMÍREZ-OYANGUREN P,et al. Comparison of limit-equilibrium,numerical and physical models of wall slope stability[J]. International Journal of Rock Mechanics and Mining Sciences,2011,48(1):16−26. doi: 10.1016/j.ijrmms.2010.06.013
|
[12] |
南存全,王礼江,吕进国,等. 露天边帮煤井工长壁综放开采工作面顶板压力计算[J]. 煤炭学报,2019,44(6):1753−1763.
NAN Cunquan,WANG Lijiang,LVJinguo,et al. Calculation of roof pressure in longwall fully mechanized top coal caving face with open-pit slope mine[J]. Journal of China Coal Society,2019,44(6):1753−1763.
|
[13] |
沈新普,岑章志,徐秉业,等. 露天矿边坡及地表变形综合整治总体设计有限元计算[J]. 岩石力学与工程学报,1995,14(3):201−210.
SHEN Xinpu,CEN Zhangzhi,XU Bingye,et al. Fem computation on the overall design of unified reinforcement for open-pit and ground-surface deformation[J]. Chinese Journal of Rock Mechanics and Engineering,1995,14(3):201−210.
|
[14] |
韩光. 露天矿顺层岩质高边坡稳定性及安全控制关键技术研究[D]. 北京:北京科技大学,2017.
HAN Guang. Research on the key technique of stability and safety control of high bedding rock slope in open-pit mine[D]. Beijing:University of Science and Technology Beijing,2017.
|
[15] |
任高峰. 露井联合开采作用边坡损害机理及控制研究[D]. 武汉:武汉理工大学,2010.
REN Gaofeng. Study on the damage mechanism to slope with the combination of underground mining and open-pit mining[D]. Wuhan:Wuhan University of Technology,2010.
|
[16] |
唐文亮. 扎哈淖尔露天矿复合边坡稳定性及开采控制技术研究[D]. 徐州:中国矿业大学,2017.
TANG Wenliang. Study on composite slope stability and mining control technique for zhahanao’er open-pit mine[D]. Xuzhou:China University of Mining and Technology,2017.
|
[17] |
钱鸣高,缪协兴,何富连. 采场“砌体梁”结构的关键块分析[J]. 煤炭学报,1994(6):557−563.
QIAN Minggao,MIAO Xiexing,HE Fulian. Analysis of key block in the structure of voussoir beam in longwall mining[J]. Journal of China Coal Society,1994(6):557−563.
|
[18] |
钱鸣高,缪协兴. 采场上覆岩层结构的形态与受力分析[J]. 岩石力学与工程学报,1995(2):97−106. doi: 10.3321/j.issn:1000-6915.1995.02.006
QIAN Minggao,MIAO Xiexing. Theoretical analysis on the structukal form and stability of overlying stkata in longwall mining[J]. Chinese Journal of Rock Mechanics and Engineering,1995(2):97−106. doi: 10.3321/j.issn:1000-6915.1995.02.006
|
[19] |
钱鸣高. 20年来采场围岩控制理论与实践的回顾[J]. 中国矿业大学学报,2000,29(1):1−4. doi: 10.3321/j.issn:1000-1964.2000.01.001
QIAN Minggao. Review of the theory and practice of strata control around longwall face in recent 20 years[J]. Journal of China University of Mining & Technology,2000,29(1):1−4. doi: 10.3321/j.issn:1000-1964.2000.01.001
|
[20] |
郝保钦,张昌锁,王晨龙,等. 岩石PFC2D模型细观参数确定方法研究[J]. 煤炭科学技术,2022,50(4):132−141.
HAO Baoqing,ZHANG Changsuo,WANG Chenlong,et al. Study on determination micro-parmeters of rock PFC2D model[J]. Coal Science and Technology,2022,50(4):132−141.
|
[21] |
黄立明. 边坡回填压脚治理措施的稳定性计算方法研究[D]. 南京:南京大学,2015.
HUANG Liming. The research on the stability calculation of slopes with a toe-berm[D]. Nanjing:Nanjing University,2015.
|
[22] |
吴志轩,张大峰,孔郁斐,等. 基−填界面开挖台阶对顺坡填筑高边坡稳定性影响研究[J]. 工程力学,2019,36(12):90−97.
WU Zhixuan, ZHANG Dafeng, KONG Yufei, et al. Study on stability influence of high slope foundation-fill interfacial excavation steps[J]. Engineering Mechanics,2019,36(12):90−97.
|