Citation: | LI Ang,YANG Junhao,ZHANG Wenzhong,et al. Experimental and applied research on wellbore water seepage simulation based on hydrophobic depressurization method[J]. Coal Science and Technology,2025,53(2):301−313. DOI: 10.12438/cst.2024-0145 |
With the continuous development of China’s coal resources to the deep end, the complex conditions of rock stratum existence bring great challenges to the construction and use of shafts. Deep vertical shafts often traverse multi-layer aquifers, and the seepage problem of the shaft wall caused by roof pressure water is particularly serious, which not only threatens the mine safety, but also brings challenges to the traditional grouting management methods, such as high cost, difficult construction and repeated seepage problems. In this regard, a set of visual similar simulation experiment platform was established based on the hydrophobic pressure reduction theory, simulated the water pressure of the well wall and the change of the flow rate of the water discharge holes under the conditions of different rock formations and different number of water discharge holes, analyzed the flow rate and seepage law of the water discharge holes, the development law of the morphology of the groundwater landing funnels, and the change law of the seepage water pressure and the pressure law of the well wall. And take Binchang Wenjiapo coal mine as an example to carry out on-site water discharge test. The results show that: the flow rate at the outlet increases with the increase of pipe diameter; the water flow rate of two holes increases more than that of a single hole, and the water flow rate of three holes increases less; the closer to the well, the deeper the water level drops, the influence range of the landing funnel increases with the increase of the number of discharge holes, the shape of the landing funnel of the single-layer water discharge experiment is kept symmetrically with the descending holes, and the bottom end of the funnel shows a conical shape. The water pressure decreases quickly in the early stage of water discharge, and tends to stabilize in the later stage; the results of the simulation experiment are applied to the field, and the single-hole and double-hole water discharge tests are carried out by drilling sparse discharge holes between the main and auxiliary wells of the Wenjiapo Mine, and the stabilized water influx in the single-hole is 75 m3/h, and the stabilized water influx in the double-hole is 175 m3/h. The test has significantly lowered the groundwater level, and formed the landing funnel with a maximum depth of 40 m. The actual measurement in the field is more in agreement with the results of the simulation experiment, which verifies the similarity with the results of the simulation experiment. Simulation test results are more consistent, verifying the scientific and practical effect of the hydrophobic bucking management method. The results of this research can help to promote the progress of wellbore water seepage control technology under the influence of deep roof pressurized aquifer.
[1] |
谢和平,吴立新,郑德志. 2025年中国能源消费及煤炭需求预测[J]. 煤炭学报,2019,44(7):1949−1960.
XIE Heping,WU Lixin,ZHENG Dezhi. Prediction on the energy consumption and coal demand of China in 2025[J]. Journal of China Coal Society,2019,44(7):1949−1960.
|
[2] |
任怀伟,巩师鑫,刘新华,等. 煤矿千米深井智能开采关键技术研究与应用[J]. 煤炭科学技术,2021,49(4):149−158.
REN Huaiwei,GONG Shixin,LIU Xinhua,et al. Research and application on key techniques of intelligent mining for kilometer deep coal mine[J]. Coal Science and Technology,2021,49(4):149−158.
|
[3] |
LI A,DING X S,YU Z Z,et al. Prediction model of fracture depth and water inrush risk zoning in deep mining coal seam floor[J]. Environmental Earth Sciences,2022,81(11):315. doi: 10.1007/s12665-022-10431-8
|
[4] |
李昂,周永根,杨宇轩,等. 大埋深高承压水双层结构底板破坏机理及应用研究[J]. 煤炭科学技术,2023,51(10):207−219.
LI Ang,ZHOU Yonggen,YANG Yuxuan,et al. Study on failure mechanism and application of double-layer structure floor with large buried depth and high confined water[J]. Coal Science and Technology,2023,51(10):207−219.
|
[5] |
刘志强,宋朝阳,纪洪广,等. 深部矿产资源开采矿井建设模式及其关键技术[J]. 煤炭学报,2021,46(3):826−845.
LIU Zhiqiang,SONG Chaoyang,JI Hongguang,et al. Construction mode and key technology of mining shaft engineering for deep mineral resources[J]. Journal of China Coal Society,2021,46(3):826−845.
|
[6] |
赵春虎,王世东. 煤矿井下疏水钻孔涌水时空效应与顶板水害控制疏水模式[J]. 采矿与安全工程学报,2023,40(2):313−321.
ZHAO Chunhu,WANG Shidong. Time and space effect of water gushing from drainage borehole in coal mine and controlling drainage to prevent roof water disaster in coal seam[J]. Journal of Mining and Safety Engineering,2023,40(2):313−321.
|
[7] |
李昂,纪丙楠,牟谦,等. 深部煤岩层复合结构底板破坏机制及应用研究[J]. 岩石力学与工程学报,2022,41(3):559−572.
LI Ang,JI Bingnan,MOU Qian,et al. Failure mechanism of composite structure floors of deep coal and rock strata and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2022,41(3):559−572.
|
[8] |
WU T,ZHOU X M,ZHANG L G,et al. Theory and technology of real-time temperature field monitoring of vertical shaft frozen wall under high-velocity groundwater conditions[J]. Cold Regions Science and Technology,2021,189:103337. doi: 10.1016/j.coldregions.2021.103337
|
[9] |
刘志强,宋朝阳,程守业,等. 千米级竖井全断面科学钻进装备与关键技术分析[J]. 煤炭学报,2020,45(11):3645−3656.
LIU Zhiqiang,SONG Chaoyang,CHENG Shouye,et al. Equipment and key technologies for full-section scientifically drilling of kilometer-level vertical shafts[J]. Journal of China Coal Society,2020,45(11):3645−3656.
|
[10] |
庞涛,姜在炳,惠江涛,等. 煤系水平井定向射孔压裂裂缝扩展机制[J]. 煤田地质与勘探,2024,52(4):68−75. doi: 10.12363/issn.1001-1986.23.08.0496
PANG Tao,JIANG Zaibing,HUI Jiangtao,et al. Fracture extension in coal seam with horizontal wells and directional perforation[J]. Coal Geology & Exploration,2024,52(4):68−75. doi: 10.12363/issn.1001-1986.23.08.0496
|
[11] |
XIE S R,JIANG Z S,CHEN D D,et al. Study on zonal cooperative control technology of surrounding rock of super large section soft rock chamber group connected by deep vertical shaft[J]. Advances in Civil Engineering,2022,2022(1):4220998. doi: 10.1155/2022/4220998
|
[12] |
尹尚先,徐斌,尹慧超,等. 矿井水防治学科基本架构及内涵[J]. 煤炭科学技术,2023,51(7):24−35.
YIN Shangxian,XU Bin,YIN Huichao,et al. Basic structure and connotation of mine water prevention and control discipline[J]. Coal Science and Technology,2023,51(7):24−35.
|
[13] |
石银斌,杨志斌,王海,等. 富水松散地层煤矿斜井井筒渗漏水治理技术[J]. 煤矿安全,2023,54(5):121−126.
SHI Yinbin,YANG Zhibin,WANG Hai,et al. Water leakage control technology of inclined shaft in loose strata coal mine with rich water[J]. Safety in Coal Mines,2023,54(5):121−126.
|
[14] |
温会芳,刘建勋,李红铃等. 一种基于断裂带地面注浆的治理方案CN117738190A[P]. 2024−03−22.
|
[15] |
袁东锋,高晓耕. 黔南灯影组巨厚含水层立井井筒帷幕注浆参数研究[J]. 煤炭科学技术,2021,49(3):71−77.
YUAN Dongfeng,GAO Xiaogeng. Study on curtain grouting parameters of vertical shaft in Dengying formation of southern Guizhou with thick aquifer[J]. Coal Science and Technology,2021,49(3):71−77.
|
[16] |
毛锦波,李亚隆,姬中奎,等. 富水陡倾斜大理岩增透引流注浆技术研究:以天山胜利隧道4号通风竖井为例[J]. 隧道建设(中英文),2024,44(2):332−340.
MAO Jinbo,LI Yalong,JI Zhongkui,et al. Grouting technology for steeply inclined marble with rich water by increasing permeability and drainage:A case study of No. 4 ventilation shaft of Tianshan Shengli tunnel[J]. Tunnel Construction,2024,44(2):332−340.
|
[17] |
王雪松,程桦,荣传新,等. 基于地面定向钻孔注浆的煤矿立井钻井法井壁渗漏水治理技术[J]. 煤炭科学技术,2024,52(7):168−177.
WANG Xuesong,CHENG Hua,RONG Chuanxin et al. Research on the treatment technology of water leakage from coal mine vertical drilling shaft lining based on ground directional drilling grouting[J]. Coal Science and Technology,2024,52(7):168−177.
|
[18] |
冉海军,张文俊,高广义,等. 高黎贡山隧道1号竖井工作面预注浆循环段高分析与应用[J]. 隧道建设(中英文),2021,41(3):427−432.
RAN Haijun,ZHANG Wenjun,GAO Guangyi,et al. Analysis and application of circulating drilling hole depth of working face pregrouting for shaft No. 1 of Gaoligongshan tunnel[J]. Tunnel Construction,2021,41(3):427−432.
|
[19] |
周晓敏,徐衍,刘书杰,等. 金矿超深立井含水围岩注浆加固的应力场和渗流场研究[J]. 岩石力学与工程学报,2020,39(8):1611−1621.
ZHOU Xiaomin,XU Yan,LIU Shujie,et al. Research on stress and seepage fields of surrounding rock grouting of ultra-deep shafts of gold mines[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(8):1611−1621.
|
[20] |
高广义. 富水风化花岗岩铁路深大竖井涌水治理施工技术:以大理至瑞丽铁路高黎贡山隧道1~#竖井为例[J]. 隧道建设(中英文),2020,40(S1):358−363.
GAO Guangyi. Water gushing treatment technology for deep and large vertical shafts of railway in water-rich weathered granite:A case study on #1 vertical shaft of Gaoligongshan tunnel on Dali-Ruili railway[J]. Tunnel Construction,2020,40(S1):358−363.
|
[21] |
谢伟华. 超前探水注浆堵水技术在竖井施工中的运用与改进[J]. 世界有色金属,2017(21):226−228.
XIE Weihua. Application and improvement of advanced water injection grouting water plugging technology in shaft construction[J]. World Nonferrous Metals,2017(21):226−228.
|
[22] |
耿春雷,董阳,左然芳,等. 煤矿注浆技术研究现状与展望[J]. 工业建筑,2023,53(S1):416−418.
GENG Chunlei,DONG Yang,ZUO Ranfang,et al. Research status and prospect of coal mine grouting technology[J]. Industrial Construction,2023,53(S1):416−418.
|
[23] |
杨柱,叶强,李阳明,等. 复杂大水矿山近矿体帷幕注浆技术优化及应用[J]. 矿业研究与开发,2023,43(11):157−162.
YANG Zhu,YE Qiang,LI Yangming,et al. Optimization and application of curtain grouting technology near ore body in complex water-rich mine[J]. Mining Research and Development,2023,43(11):157−162.
|
[24] |
周禹良,李斌,杨雪. 富水溶蚀白云岩地层井筒地面预注浆技术研究[J]. 金属矿山,2022(12):10−17.
ZHOU Yuliang,LI Bin,YANG Xue. Surface pre-grouting technique for sealing water rich dissolved dolomite aquifer for vertical shaft[J]. Metal Mine,2022(12):10−17.
|
[25] |
徐宇,李孜军,王君健,等. 矿井热害治理协同地热开采相似模拟实验研究[J]. 中南大学学报(自然科学版),2023,54(6):2162−2173.
XU Yu,LI Zijun,WANG Junjian,et al. Research on simulation experiment for synergetic mining of geothermal energy to heat hazard control[J]. Journal of Central South University (Science and Technology),2023,54(6):2162−2173.
|
[26] |
范钢伟,张世忠,张东升,等. 采动覆岩固液耦合物理模拟实验系统开发与应用[J]. 采矿与安全工程学报,2016,33(5):898−903.
FAN Gangwei,ZHANG Shizhong,ZHANG Dongsheng,et al. Development and application of a solid-liquid coupling physical experiment system for modeling mining-induced overburden movement[J]. Journal of Mining & Safety Engineering,2016,33(5):898−903.
|
[27] |
张怀文,曲从锋,何海星,等. 昭通地区页岩气浅层大缝洞堵漏工具研制[J]. 天然气工业,2021,41(S1):182−185.
ZHANG Huaiwen,QU Congfeng,HE Haixing,et al. Development of plugging tool for shallow large fracture and cave of shale gas in Zhaotong area[J]. Natural Gas Industry,2021,41(S1):182−185.
|
[28] |
王文学,郝清扬,薛景元,等. 含水层底部单孔非完整疏放水井渗流特征砂槽试验[J]. 煤炭学报,2023,48(3):1290−1301.
WANG Wenxue,HAO Qingyang,XUE Jingyuan,et al. Sand tank test on seepage characteristics of a single partially penetrating de-watering well from the bottom of an overlying aquifer[J]. Journal of China Coal Society,2023,48(3):1290−1301.
|
[29] |
封培然,宋利丽. 石膏砂浆质量控制的几点建议[J]. 水泥工程,2023(5):79−82.
FENG Peiran,SONG Lili. Several suggestions for quality control of gypsum mortar[J]. Cement Engineering,2023(5):79−82.
|
[30] |
牟义飞. 岩石类脆性介质非均匀损伤的描述及其空间分布效应研究[D]. 秦皇岛:燕山大学,2023.
MOU Yifei. Description of non-uniform damage in brittle rock-like media and its spatial distribution effect[D]. Qinhuangdao:Yanshan University,2023.
|
[31] |
冉俊. 露天转地下开采过程覆盖层对边坡稳定性的影响研究[D]. 沈阳:东北大学,2019.
RAN Jun. Study on the influence of overburden on slope stability during the process of open pit to underground mining[D]. Shenyang:Northeastern University,2019.
|
[1] | LI Shuaiqian, GUO Zhongping, WEN Zhuoyue, XIE Zhonghui, HOU Zhengtao, LI Peng. Analysis of coal mine environment corrosion tendency based on fuzzy comprehensive evaluation method[J]. COAL SCIENCE AND TECHNOLOGY, 2025, 53(5): 52-63. DOI: 10.12438/cst.2024-0150 |
[2] | CHEN Juntao, LI Wenxin, XUE Feng, WANG Kai, ZHANG Chengxiang, SONG Tao. Comprehensive evaluation of TOPSIS-RSR grouting effect based on subjective and objective combined weights[J]. COAL SCIENCE AND TECHNOLOGY, 2023, 51(S2): 191-199. DOI: 10.13199/j.cnki.cst.2022-1695 |
[3] | LYU Yuguang, LI Hongjie, XIA Yujun, LIU Hanci, HAN Gang. Prediction and evaluation study on coal seam roof waterinrush based on multi-type four-double method[J]. COAL SCIENCE AND TECHNOLOGY, 2019, (9). |
[4] | MEI Fang, KANG Yongshang, LI Zhe, DENG Ze, WANG Weihong, GU Jiaoyang. Applicability evaluation of logging method for recognition of coal body structure in medium and high rank coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2019, (7). |
[5] | CHEN Xuefeng, MIAO Yongchun, CHEN Wentao. Study on evaluation of mine floor water inrush danger based on Fuzzy Set Pair Analysis Method[J]. COAL SCIENCE AND TECHNOLOGY, 2019, (2). |
[6] | XIAO Lele, NIU Chao, DAI Gelian, NIE Wenjie, ZHANG Huiting, GAO Yafei. Evaluation of water abundance in Zhiluo formation based Watery Structure Index Method[J]. COAL SCIENCE AND TECHNOLOGY, 2018, (11). |
[7] | ZHOU Mengran ZHANG Jiewei YAN Pengcheng HU Feng, . Study on water inrush monitoring technology of coal mine based on pH value temperature compensation method[J]. COAL SCIENCE AND TECHNOLOGY, 2017, (9). |
[8] | Zhang Chunpeng wu Caifang Li TengZhang Xiaoyang, . Principal Component Analysis Method applied to evaluation on coalbed methane block selection[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (8). |
[9] | Liao Wende Zhong Yonglin Ye Junjie Zhou Zhiqiang, . Quantitative evaluation method of mine gas disaster hazard sources based on AHP-FCE Method[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (6). |
[10] | Application of Modified Water Inrush Coefficient Method to Evaluation of Water Inrush from Mine Floor[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (8). |
1. |
刘光伟,涂俊雄,郭伟强,韩雨轩,李春林,白羽,于明宇,贾瑞军. 复杂工程地质条件下露天矿采区转向过渡接续方案. 煤炭科学技术. 2025(03): 450-460 .
![]() | |
2. |
马力,王恒荣,罗科,李瑞行,靳新宇,常治国. 分区内排露天煤矿压帮留沟模式及参数优化. 煤炭学报. 2024(04): 1834-1844 .
![]() | |
3. |
李雁飞. 西湾露天煤矿采区转向方案研究. 中国煤炭. 2024(08): 135-141 .
![]() |