Advance Search
CUI Weixiu,MU Runqing,XIE Hongzhang,et al. Research on intelligent conveying technology of 500 m ultra-long face scraper[J]. Coal Science and Technology,2024,52(4):326−335. DOI: 10.12438/cst.2023-0739
Citation: CUI Weixiu,MU Runqing,XIE Hongzhang,et al. Research on intelligent conveying technology of 500 m ultra-long face scraper[J]. Coal Science and Technology,2024,52(4):326−335. DOI: 10.12438/cst.2023-0739

Research on intelligent conveying technology of 500 m ultra-long face scraper

More Information
  • Received Date: May 19, 2023
  • Available Online: March 26, 2024
  • In the field of medium and thick coal seam mining, intelligent mining of ultra-long face is the development trend of coal mining technology, and intelligent transportation is an important part of it.Based on the summary of the problems of the scraper transportation system in the intelligent mining of 400−450 m working face in China at present, the method of reasonable matching between the installed power and the volume of the intelligent scraper transportation system of 500 m ultra-long working face is explored, and the feasible scheme to solve the technical problems of scraper transportation of 500 m ultra-long working face is proposed.Based on the technical scheme of selection of three fully mechanized mining machines and the application practice of high-end transmission system above 2 000 kW, the domestic 2 500 kW high-power variable frequency integrated intelligent transmission system is developed, including variable frequency integrated motor, reducer, moment limiter, etc. The key technologies and key components are realized in China.In order to solve the technical problem that the center of gravity of the transmission device is shifted back and the middle groove width parameter is unchanged, which is not conducive to the smooth moving of the end equipment, the anti-deflection technology of the high-power transmission device configured with medium groove width is studied, the multi-working condition moving model of the head (tail) moving part is established, and the structure of the moving part is optimized. The problems of overall head imbalance, serious drift and aggravating difficulty of moving are solved due to the deflection of transmission device.In view of the problems that the hydraulic motor is difficult to drive when the coal load in the middle trough is large after the scraper chain is broken, the digital hydraulic motor with large torque is selected and the digital motor control system is developed to reduce the working intensity of the scraper chain maintenance.Based on the demand for real-time deformation compensation of chain during the safe operation of scraper transportation equipment, the tensioning control strategy of 500 m haul chain is proposed, and the intelligent adjustment technology of chain tension with load gradient during operation is developed to solve the dynamic compensation problem of elastic deformation of 500 m haul chain. Moreover, AI high-definition camera is installed on the upper end of the tail frame cover plate to realize real-time detection of the running state of the chain, which provides convenience for the staff to real-time control of the running state of the chain.In addition, in order to improve the adaptability of the telescopic tail to a variety of complex working conditions and ensure that it can expand freely during the service cycle, a technical scheme is proposed to improve the strength and stiffness of the telescopic tail from three aspects of structure, material and manufacturing process, and the hydraulic cylinder protective cover and automatic flushing system of the telescopic tail slide are developed to further improve the reliability of the telescopic tail.Underground field industrial tests show that: The equipment capacity and installed power matching reasonable, 2500 kW frequency conversion integrated intelligent transmission system occupies less space, accurate torque transmission, inclined push head (tail) push part is stable and reliable, digital hydraulic motor to deal with the problem of broken chain convenient and labor saving, the retractable tail according to the load gradient automatic tensioning without stuck, to ensure the safety and efficient transportation of coal. It provides technical support for intelligent mining of 500 m ultra-long working face.

  • [1]
    谢和平,王金华,姜鹏飞,等. 煤炭科学开采新理念与技术变革研究[J]. 中国工程科学,2015,17(9):36−41.

    XIE Heping,WANG Jinhua,JIANG Pengfei,et al. New conceptsand technology evolutions in scientific coal mining[J]. Engineering Sciences,2015,17(9):36−41.
    [2]
    唐永志,傅家德,李万峰,等. 深部大采高超长工作面开采技术研究及展望[J]煤炭技术,2015,34(12):15−17.

    TANG Yongzhi,FU Jiade,LI Wanfeng, et al. Prospect and research on mining technology in ultra Long deep large height fully mechanized mining face[J]. Coal Technology,2015,34(12):15−17.
    [3]
    李西蒙,刘长友,SydS. Peng. 美国快速推进长壁工作面开采设备发展现状[J]. 煤炭科学技术,2016,44(1):166−171.

    LI Ximmeng,LIU Changyou,Peng S S. Mining equipment develop-ment status of fast advance longwall face in US[J]. Coal Science and Technology,2016,44(1):166−171.
    [4]
    彭赐灯,杜 锋,程敬义,等. 美国长壁工作面自动化发展[J]. 中国矿业大学学报,2019,48(4):693−703.

    PENG Syd S,DU Feng,CHENG Jingyi,et al. Automation in U. S. Long wall coal mining[J]. Journal of China University of Mini&Technology,2019,48(4):693−703.
    [5]
    王庆雄,鞠金峰. 450 m 超长综采工作面矿压显现规律研究[J]. 煤炭科学技术,2014,42(3):125−128.

    WANG Qingxiong,JU Jinfeng. study on mine strata pressure behavior law of 450 m ultra long fully mechanized coal mining face[J]. Coal Science and Technology,2014,42(3):125−128.
    [6]
    张金虎,李明忠,胡 健,等. 超长工作面布置方式优化设计与设备选型配套 [J]. 煤炭工程,2021,53(7):7−10.

    ZHANG Jinhu ,LI Mingzhong,HU Jian, et al.Optimized design of super-long working face layout and the equipment selection and matching[J]. Coal Engineering ,2021,53(7):7−10.
    [7]
    王家臣,PENG Syd S,李 杨. 美国煤炭地下开采与自动化技术进展[J]. 煤炭学报,2021,46(1):36−45.

    WANG Jiachen,PENG Syd S,LI Yang. State-of-the-art in underground coal mining and automation technology inthe United States[J]. Journal of China Coal Society,2021,46(1):36−45.
    [8]
    杜 锋,彭赐灯. 美国长壁工作面自动化开采技术发展现状及思考[J]. 中国矿业大学学报,2018,47(5):949−956.

    DU Feng,PENG Syd S. The state-of-the-art and thought of automa-ted longwall mining in the United States[J]. Journal of China Uni-versity of Mining & Technology,2018,47(5):949−956.
    [9]
    王国法,赵国瑞,任怀伟. 智慧煤矿与智能化开采关键核心技术分析[J]. 煤炭学报,2019,44(1):34−41.

    WANG Guofa,ZHAO Guorui,REN Huaiwei. Analysis on key technologies of intelligent coal mine and intelligent mining[J]. Journal of China Coal Society,2019,44(1):34−41.
    [10]
    王国法,范京道,徐亚军,等. 煤炭智能化开采关键技术创新进展与展望[J]. 工矿自动化,2018,44(2):5−12.

    WANG Guofa,FAN Jingdao,XU Yajun,et al. Innovation progressand prospect on key technologies of intelligent coal mining[J]. Industry and Mine Automation,2018,44(2):5−12.
    [11]
    刘 峰,曹文君,张建明. 持续推进煤矿智能化 促进我国煤炭工业高质量发展[J]. 中国煤炭,2019,45(12):32−36.

    LIU Feng,CAO Wenjun,ZHANG Jianming. Coal mine intellectuali-zation:the core technology of high quality development[J]. China Coal,2019,45(12):32−36.
    [12]
    王家臣,王兆会,杨 杰,等. 千米深井超长工作面采动应力旋转特征及应用[J]. 煤炭学报,2020,45(3):876−888.

    WANG Jiachen,WANG Zhaohui,YANG Jie,et al. Mining-induced stress rotation and its application in longwall face with large length in kilometer deep coal mine[J]. Journal of China Coal Society,2020,45(3):876−888.
    [13]
    范京道,徐建军,张玉良,等. 不同煤层地质条件下智能化无人综采技术[J]. 煤炭科学技术,2019,47(3):43−52.

    FAN Jingdao,XU Jianjun,ZHANG Yuliang,et al. Intelligent un-manned fully-mechanized mining technology under conditions of different seams geology[J]. Coal Science and Technology,2019,47(3):43−52.
    [14]
    刘会利,郭彦科. 浅埋中厚煤层超长工作面末采矿压规 律研究[J]. 煤炭工程,2021,53(3):6−10.

    LIU Huili,GUO Yanke. Law of mine pressure during the end mining of super-long working face in shallow medium-thick coal seam[J]. Coal Engineering,2021,53(3):6−10.
    [15]
    王家臣,杨胜利,杨宝贵,等. 深井超长工作面基本顶分区破断模型与支架阻力分布特征[J]. 煤炭学报,2019,44(1):54−63.

    WANG Jiachen,YANG Shengli,YANG Baogui,et al. Roof sub-regional fracturing and support resistance distribution in deep longwall face with ultra-large length[J]. Journal of China Coal Society,2019,44(1):54−63.
    [16]
    陈忠辉,谢和平,李全生. 长壁工作面采场围岩铰接薄板组力学模型研究[J]. 煤炭学报,2005,30(2):172−176.

    CHEN Zhonghui,XIE Heping,LI Quansheng. Study on plategroup mechanical model for main roof of longwall face[J]. Journal of China Coal Society,2005,30(2):172−176.
    [17]
    缪协兴,钱鸣高. 超长综放工作面覆岩关键层破断特征及对采场矿压的影响[J]. 岩石力学与工程学报,2003,22(1):45−47.

    MIAO Xiexing,QIAN Minggao. Broken feature of key strata and itsinfluence on rock pressure in super-length fully-mechanized coal face[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(1):45−47.
    [18]
    文 虎,王 文,陶维国,等. 超长综采工作面撤架期间煤自燃预测及防控技术研究[J]. 煤炭科学技术,2020,48(1):167−173.

    WEN Hu,WANG Wen,TAO Weiguo,et al. Study on coal spontaneous combustion prediction and control technology during withdrawal period of super long fully-mechanized mining face[J]. Coal Science and Technology,2020,48(1):167−173.
    [19]
    宋选民,顾铁凤,闫志海. 浅埋煤层大采高工作面长度增加对矿压显现的影响规律研究[J]. 岩石力学与工程学报,2007,26(S2):4007−4012.

    SONG Xuanmin,GU Tiefeng,YAN Zhihai. Research on the influ-ence of the increase in the length of the large mining face in shallow buried seams on the appearance of ground pressure[J]. ChineseJournal of Rock Mechanics and Engineering,2007,26(S2):4007−4012.
    [20]
    王生彪,黄庆享. 浅埋煤层 400 m 超长综采工作面矿压规律研究[J]. 煤炭科学技术,2018,46(6):75−80.

    WANG Shengbiao,HUANG Qingxiang. Study on roof weighting of 400 m fully-mechanized mining facein shallow coal seam[J]. Coal Science and Technology,2018,46(6):75−80.
  • Related Articles

    [1]CHI Huanlei, YUAN Zhi, CAO Yan, HU Denggao, SONG Zhenduo. Study on digital twin-based smart fully-mechanized coal mining workface monitoring technology[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(10): 153-161.
    [2]WANG Xiangyu, ZHANG Weidong, WANG Guanghui, WU Bowen, LI Junchen, ZHENG Zhe. Study on high-energy strengthening anchor mechanism of tension pre-tightening bolt support system[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(2): 38-44. DOI: 10.13199/j.cnki.cst.2021.02.005
    [3]LEI Zhaoyuan, YAO Yilong, LI Lei, XIAO Qu, LI Chuan, CAO Zhe. Research on automatic follow-up control technology of hydraulic support in intelligent working face with large mining height[J]. COAL SCIENCE AND TECHNOLOGY, 2019, (7).
    [4]LI Huaizhen, XIAO Tongqiang, CHEN Xiangyu. Research on distribution law of interfacial shear stress between surrounding rock and anchorage agent under tension condition[J]. COAL SCIENCE AND TECHNOLOGY, 2018, (12).
    [5]Niu Jianfeng. Study on automatic and intelligent following control system of hydraulic powered support in fully- mechanized coal mining face[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (12).
    [6]Study on Bolt Pre-tension Control in Underground Mine[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (1).
    [7]Semi Automatic Mapping of 3D Mine Roadway[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (1).
  • Cited by

    Periodical cited type(8)

    1. 范宝冬,马开德,崔卫秀,李致远. 采煤工作面刮板输送机智能控制系统研究. 工矿自动化. 2025(01): 52-60 .
    2. 霍炳杰,蔡树梅,杨刚. 大功率矿用减速器冷却系统设计与研究. 机械工程与自动化. 2025(01): 215-216+219 .
    3. 李灵锋,张洁,陈茁,查天任,尹瑞. 刮板输送机断链智能监测技术研究. 工矿自动化. 2025(03): 63-69+77 .
    4. 邢有望,李明忠,张金虎,闫汝瑜,刘江斌. 基于矩阵位移法的超长工作面顶板挠度分布研究. 煤炭科学技术. 2025(05): 39-51 . 本站查看
    5. 孙松,马树伟,范士峰. 千万吨级超长综放工作面刮板输送系统选型及配套研究. 中国机械. 2024(18): 48-52 .
    6. 张鹏,王鹏,沈丰,刘宏飞,米佩,冯景浦. 刮板输送机发展现状与趋势. 煤矿机械. 2024(08): 68-70 .
    7. 杨鑫,苏乐,程永军,王波,赵愿,杨雄伟,赵成龙,曹现刚,赵江滨. 基于多种图结构信息融合的刮板输送机健康状态识别. 煤炭科学技术. 2024(08): 171-181 . 本站查看
    8. 史晓恒. SGZ1000型高端智能刮板机技术分析与应用. 自动化应用. 2024(17): 126-128+131 .

    Other cited types(0)

Catalog

    Article views (126) PDF downloads (53) Cited by(8)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return