近断层孤岛煤巷非对称变形机理及外锚−内卸协同控制研究

Study on asymmetric deformation mechanism and external anchor-internal unloading cooperative control of isolated coal roadway near fault

  • 摘要: 针对断层影响区孤岛工作面回采巷道受邻近采空区残余支承压力、工作面超前采动应力及断层构造应力叠加影响而产生的非对称大变形问题,以李雅庄煤矿2-621工作面运输巷为工程背景,采用现场监测、复变函数解析、FLAC3D数值模拟、含构造弱面煤体注浆改性试验及现场工业性试验相结合的方法,研究近断层孤岛煤巷非对称变形机理及“外锚−内卸”协同控制技术。结果表明:断层弱面改变了煤岩体连续性和载荷传递路径,使断层侧围岩偏应力集中及变形破坏程度高于实体煤侧,原支护条件下断层侧和实体煤侧巷帮变形量分别约为780 mm和460 mm。巷道−造穴空间双孔硐力学模型计算结果表明,造穴间距过小会诱发双孔硐应力叠加,过大则削弱卸压效果,7 m为本工程条件下较优造穴间距;结合数值模拟结果,形成了10 m近断层强控制区避让断层侧、20 m构造过渡区前移孔位并缩短孔长、30 m远离断层区参数趋于常规化的分区差异化卸压方案。注浆改性试验表明,构造弱面使煤体峰值强度降至约5.5 MPa,注浆后峰值承载力提高至约13.5 MPa,破坏模式由弱面主导滑移转变为整体协同承载。现场应用后,围岩变形连续可控。研究表明,浅部锚注重构承载结构与深部造穴转移高偏应力相结合的“外锚−内卸”协同控制技术,可有效控制近断层孤岛煤巷非对称大变形。

     

    Abstract: To address the asymmetric large deformation of a gateroad in a fault-affected isolated working face subjected to the superposition of residual abutment pressure from an adjacent gob, advance mining-induced stress, and fault-related tectonic stress, the transport roadway of the 2-621 working face in Liyazhuang Coal Mine was selected as the engineering background. Field monitoring, complex-variable analytical modelling, FLAC3D numerical simulation, grouting-modification tests on coal containing structural weak planes, and an industrial field trial were combined to investigate the asymmetric deformation mechanism of the near-fault isolated coal roadway and develop an external anchorage–internal destressing control method. The results show that the fault weak plane disrupts the continuity of the coal–rock mass and alters the load-transfer path, resulting in higher deviatoric-stress concentration and more severe deformation on the fault side than on the solid-coal side. Under the original support condition, the rib deformations on the fault side and solid-coal side were approximately 780 and 460 mm, respectively. Analytical results from the spatial twin-opening model of the roadway and destressing cavities indicate that excessively small cavity spacing causes stress-field overlap, whereas excessively large spacing weakens the destressing effect. A spacing of 7 m was therefore identified as suitable for the investigated conditions. Combined with the numerical results, a zoned differential destressing scheme was developed: the fault side was avoided within the 10 m near-fault intensive-control zone; the cavity position was advanced and the cavity length reduced within the 20 m structural-transition zone; and the parameters gradually approached the conventional design within the 30 m zone farther from the fault. The grouting-modification tests showed that the structural weak plane reduced the peak strength of the coal to approximately 5.5 MPa. After grouting, the peak load-bearing capacity increased to approximately 13.5 MPa, and the failure mode changed from weak-plane-controlled sliding to coordinated deformation of the composite specimen. Following field implementation, the surrounding-rock deformation remained continuous and controllable. These results demonstrate that the external anchorage–internal destressing method, which combines shallow anchorage and grouting to reconstruct the load-bearing structure with deep cavity destressing to redistribute high deviatoric stress, can effectively control asymmetric large deformation in near-fault isolated coal roadways.

     

/

返回文章
返回