复合坚硬顶板工作面致冲关键结构及调控技术研究

Research on key structures and regulation techniques of rockburst caused by composite hard roof in working face

  • 摘要: 复合坚硬顶板下厚煤层开采过程中频繁发生的冲击地压灾害,传统顶板卸压爆破虽能在一定程度上削弱应力集中,但在复合坚硬顶板条件下出现卸压失效现象,导致防冲效果有限。因此,以某矿复合坚硬顶板厚煤层工作面多次冲击地压事件为工程背景,综合运用理论分析、数值模拟和现场监测方法,系统研究了复合坚硬顶板致冲关键结构的演化特征及爆破卸压减冲失效机理。在揭示复合坚硬顶板破断运动与煤体应力传递关系的基础上,提出了结构分类方法,将其划分为悬顶增压结构、增裂缓压结构、移位调压结构和增裂导压结构。研究表明,不同结构形态决定了应力峰值位置、动载扰动强度及冲击地压风险。现有爆破角度处于岩层悬顶角与触矸角之间时,顶板运动形成增裂缓压结构,虽能降低部分应力,但沿空巷道附近仍处于高应力分布区,且低位顶板垮落失稳动载易叠加扰动煤体,导致爆破卸压减冲失效。通过理论计算与UDEC数值模拟对比发现,当爆破角度调整至悬顶角附近时,复合坚硬顶板运移可转化为移位调压结构,应力峰值显著降低并远离巷道,同时低位关键块垮落充分,有效削弱了动载扰动。基于此,提出了防冲结构调控技术,优化高位爆破孔角度至悬顶线左右,在不改变低位爆破孔布置的前提下,促使顶板结构向高位发展并实现应力合理转移。现场应用显著减少了顶板高能震动事件,避免了顶板长距离悬顶现象,保障了后续工作面安全开采。

     

    Abstract: Frequent rockburst events during the extraction of thick coal seams beneath composite hard roofs present significant hazards. Although conventional roof-depressurization blasting can partially alleviate stress concentration, depressurization failure commonly occurs under composite hard-roof conditions, resulting in limited rockburst prevention effectiveness. Taking repeated rockburst occurrences on a working face with a composite hard roof and a thick coal seam in a specific mine as the engineering context, a combination of theoretical analysis, numerical simulation, and field monitoring was employed to systematically investigate the evolution characteristics of key impact-inducing structures and the failure mechanism of blasting-based depressurization. Based on elucidating the relationship between the fracturing–movement of the composite hard roof and the stress transfer within the coal mass, a structural classification method was established. The roof structures were categorized into four types: Top-mounted pressurization structure, Fracture and pressure relief structure, Shifted pressure regulation structure, and Fracture conducting pressure structure. The results indicate that structural morphology determines the location of stress peaks, the intensity of dynamic disturbances, and the associated rockburst risk. When the blasting angle lies between the overhanging angle and the contact angle of the roof strata, roof movement forms a fracture-induced pressure-relief structure. Although this configuration reduces part of the stress, the area near the gob-side entry remains a high-stress zone, and dynamic loads generated by instability of lower key blocks are prone to superimpose on the coal mass, causing depressurization failure. Comparative analysis between theoretical calculation and UDEC simulations shows that adjusting the blasting angle toward the overhanging angle transforms the roof movement into a displacement-regulated pressure-adjustment structure, significantly lowering the stress peak and shifting it away from the entry, while ensuring sufficient collapse of lower key blocks to effectively attenuate dynamic disturbances. Accordingly, a structural-regulation technique for rockburst prevention was proposed. By optimizing the angle of high-level blasting holes toward the overhanging line - without modifying the layout of low-level holes - the roof structure is guided upward and a more reasonable stress transfer is achieved. Field implementation markedly reduced high-energy roof vibration events, prevented long-distance roof suspension, and ensured safe extraction in subsequent working faces.

     

/

返回文章
返回